southwest_environmental_logo
Southwest Environmental Limited
London Bristol Manchester Exeter
02076 920 670 01173 270 092 01612 970 026 01392 927 961
Environmental Consultancy Services to Industry, Business and Individuals

Building Regulations Condition for Part A (Structure) Site Investigation Report

It is becoming more and more common for some council (Bristol City Council for example) to place conditions on their building regulations approval which would include the flowing statement:

"A site investigation report is required to justify the proposed foundation design:

SWEL can provide Building Near Trees Calculations with regards to point A. This will involving take some soil samples from site and having them testing for Plasticity. By determining the plasticity of a soil we can determine its shrink sell characteristics.

With regards to Point B SWEL can arrange to take 2 or more soils samples from you site, and have them tested at a laboratory so as to determine levels of contaminants.

If you would like us to carry out this service for you, then please email us (blue links top of page) to find out more. A site plan is handy to email over if you would like a quote.