Site Investigation & Phase 2 Assessment – Islington, London. N19

Site Investigation & Phase 2 Assessment – Islington, London. N19

Acting on instructions from a corporate client Southwest Environmental Limited have carried out an Environmental Site Investigation in connection with a property acquisition / purchase. 
SWEL managed to deliver a reduced scope report, sufficient for our client’s needs within a 3 week period, despite having trouble on site with buried services. 
The scope included the collection of 20 soils samples, with breaking out at each position. There were 3 deeper holes drilled, for installation of boreholes for gas and ground water monitoring. Although this was not carried out owing to time frame. 
Statistical Analysis of Results 
The site was operational at the time of the investigation, with high level of vehicular and pedestrian traffic,  despite this SWEL managed to complete site works within 2 days.
Soil testing was conducted on a rapid turnaround, and results were published as part of a contamination assessment (Phase 2). The site was found to have elevated levels Benzo-a-Pyrene, are carcinogen and as such will require remediation. 

Leave a Reply

Your email address will not be published. Required fields are marked *