{"id":110,"date":"2016-12-01T16:23:00","date_gmt":"2016-12-01T16:23:00","guid":{"rendered":"https:\/\/southwest-environmental.co.uk\/blog\/2016\/12\/01\/flood-risk-assessment-for-hotel-bristol\/"},"modified":"2016-12-01T16:23:00","modified_gmt":"2016-12-01T16:23:00","slug":"flood-risk-assessment-for-hotel-bristol","status":"publish","type":"post","link":"https:\/\/southwest-environmental.co.uk\/blog\/2016\/12\/01\/flood-risk-assessment-for-hotel-bristol\/","title":{"rendered":"Flood Risk Assessment for Hotel &#8211; Bristol"},"content":{"rendered":"<div dir=\"ltr\" style=\"text-align: left;\">\n<h2 style=\"text-align: left;\">Flood Risk Assessment for Hotel &#8211; Bristol<\/h2>\n<p>Acting on instructions from Global Client Southwest Environment have undertaken a Flood Risk Assessment for a development site in Bristol, UK.<\/p>\n<p>The project encompassese the retention of a sporting facility and the extension of the facility to include a 55 bedroom hotel and several eateries.<\/p>\n<p>A mixed use development like this is ideal for a site within a high risk flood zone as it allows for low vulnerability uses on ground floors and and high vulnerability uses on the upper floors.<\/p>\n<p>This site however, although surrounded by high risk areas, was at low risk of flooding and also had a convenient escape route in the form of a raised flyover, so as to provide an evacuation route in case of a flood.<\/p>\n<p><a href=\"http:\/\/www.southwest-environmental.co.uk\/flood%20risk%20assessment%20FRA.html\" target=\"_blank\" rel=\"noopener\">Flood Risk Assessment Bristol<\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Flood Risk Assessment for Hotel &#8211; Bristol Acting on instructions from Global Client Southwest Environment have undertaken a Flood Risk Assessment for a development site in Bristol, UK. The project encompassese the retention of a sporting facility and the extension of the facility to include a 55 bedroom hotel and several eateries. A mixed use [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-110","post","type-post","status-publish","format-standard","hentry","category-flood-risk-assessment"],"_links":{"self":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=110"}],"version-history":[{"count":0,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/110\/revisions"}],"wp:attachment":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=110"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=110"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}