{"id":136,"date":"2015-06-22T13:39:00","date_gmt":"2015-06-22T12:39:00","guid":{"rendered":"https:\/\/southwest-environmental.co.uk\/blog\/2015\/06\/22\/sustainability-statement-bristol\/"},"modified":"2015-06-22T13:39:00","modified_gmt":"2015-06-22T12:39:00","slug":"sustainability-statement-bristol","status":"publish","type":"post","link":"https:\/\/southwest-environmental.co.uk\/blog\/2015\/06\/22\/sustainability-statement-bristol\/","title":{"rendered":"Sustainability Statement &#8211; Bristol"},"content":{"rendered":"<div dir=\"ltr\" style=\"text-align: left;\">Sustainability Statement Bristol<\/p>\n<p>SWEL have recently prepared a sustainability statement for a project in Bristol. The report was wriiten to meet the demands of Bristol City Council, and contained measures to be implemented in order to meet requirements set out in local policy.<\/p>\n<p>As with all our reports, the sustainability statement was written on a quicjk turnaround provided within 10 days of commissioning. <\/p>\n<table align=\"center\" cellpadding=\"0\" cellspacing=\"0\" style=\"margin-left: auto; margin-right: auto; text-align: center;\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\"><a href=\"http:\/\/2.bp.blogspot.com\/-aTEjjGOADmY\/VYgPkfmSTEI\/AAAAAAAAAvE\/8tL-jIuq2WY\/s1600\/sustainability_statement_bristol.png\" style=\"margin-left: auto; margin-right: auto;\"><img loading=\"lazy\" decoding=\"async\" border=\"0\" height=\"315\" src=\"http:\/\/2.bp.blogspot.com\/-aTEjjGOADmY\/VYgPkfmSTEI\/AAAAAAAAAvE\/8tL-jIuq2WY\/s400\/sustainability_statement_bristol.png\" width=\"400\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">SWEl based our recommendations to suite the clients pre-existing design.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>\n<table align=\"center\" cellpadding=\"0\" cellspacing=\"0\" style=\"margin-left: auto; margin-right: auto; text-align: center;\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\"><a href=\"http:\/\/3.bp.blogspot.com\/-NOo_j8mViFU\/VYgPkiS3OfI\/AAAAAAAAAvI\/r1CNY_uipjw\/s1600\/sustainability_statement_bristol_1.png\" style=\"margin-left: auto; margin-right: auto;\"><img loading=\"lazy\" decoding=\"async\" border=\"0\" height=\"320\" src=\"http:\/\/3.bp.blogspot.com\/-NOo_j8mViFU\/VYgPkiS3OfI\/AAAAAAAAAvI\/r1CNY_uipjw\/s320\/sustainability_statement_bristol_1.png\" width=\"293\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">The scheme was a fairly typical residential change of use application.<\/td>\n<td style=\"text-align: center;\"><\/td>\n<td style=\"text-align: center;\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The sustainability statement was submitted to Bristol City Council well in advance of stipulated deadlines, and the report was well received.<\/p>\n<p><a href=\"http:\/\/www.southwest-environmental.co.uk\/sustainability.html\" target=\"_blank\" rel=\"noopener\">Sustainability Bristol<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Sustainability Statement Bristol SWEL have recently prepared a sustainability statement for a project in Bristol. The report was wriiten to meet the demands of Bristol City Council, and contained measures to be implemented in order to meet requirements set out in local policy. As with all our reports, the sustainability statement was written on a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-136","post","type-post","status-publish","format-standard","hentry","category-sustainability"],"_links":{"self":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/136","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=136"}],"version-history":[{"count":0,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/136\/revisions"}],"wp:attachment":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}