{"id":157,"date":"2014-07-08T14:37:00","date_gmt":"2014-07-08T13:37:00","guid":{"rendered":"https:\/\/southwest-environmental.co.uk\/blog\/2014\/07\/08\/code-for-sustainable-homes-pre-assessment-barking\/"},"modified":"2014-07-08T14:37:00","modified_gmt":"2014-07-08T13:37:00","slug":"code-for-sustainable-homes-pre-assessment-barking","status":"publish","type":"post","link":"https:\/\/southwest-environmental.co.uk\/blog\/2014\/07\/08\/code-for-sustainable-homes-pre-assessment-barking\/","title":{"rendered":"Code for Sustainable Homes Pre-Assessment &#8211; Barking"},"content":{"rendered":"<div dir=\"ltr\" style=\"text-align: left;\">Code for Sustainable Homes Pre-Assessment &#8211; Barking<\/p>\n<p>Acting on instructions from a firm of architects SWEL have prepared a <a href=\"http:\/\/www.southwest-environmental.co.uk\/projects\/code_sustainable_pre-assessment.html\" target=\"_blank\" rel=\"noopener\">Code for Sustainable Homes Pre-Assessment Report<\/a> for a 30 unit development in Barking, London.<\/p>\n<table align=\"center\" cellpadding=\"0\" cellspacing=\"0\" style=\"margin-left: auto; margin-right: auto; text-align: center;\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\"><a href=\"http:\/\/3.bp.blogspot.com\/-6CNuTN5tDic\/U7v_P83C8jI\/AAAAAAAAAVw\/KqDLhma14Qc\/s1600\/code_for_sustainable_homes_pre_assessment+(3).png\" style=\"margin-left: auto; margin-right: auto;\"><img loading=\"lazy\" decoding=\"async\" border=\"0\" src=\"http:\/\/3.bp.blogspot.com\/-6CNuTN5tDic\/U7v_P83C8jI\/AAAAAAAAAVw\/KqDLhma14Qc\/s1600\/code_for_sustainable_homes_pre_assessment+(3).png\" height=\"102\" width=\"400\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">The Project Achieved a very high SAP Rating<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The scheme sees the refurbishment of an existing building and a large extension to rear which is new build. The project is required to meet Level 4 in the <a href=\"http:\/\/www.southwest-environmental.co.uk\/further%20info\/sustainability_consultants\/code_for_sustainable_homes.html\" target=\"_blank\" rel=\"noopener\">Code for Sustainable Homes<\/a>.<\/p>\n<div style=\"clear: both; text-align: center;\"><a href=\"http:\/\/4.bp.blogspot.com\/-PX-RyBvkcGI\/U7v_kdu4KPI\/AAAAAAAAAV4\/RwKCm6wCDAQ\/s1600\/code_for_sustainable_homes_pre_assessment+(4).png\" style=\"margin-left: 1em; margin-right: 1em;\"><img loading=\"lazy\" decoding=\"async\" border=\"0\" src=\"http:\/\/4.bp.blogspot.com\/-PX-RyBvkcGI\/U7v_kdu4KPI\/AAAAAAAAAV4\/RwKCm6wCDAQ\/s1600\/code_for_sustainable_homes_pre_assessment+(4).png\" height=\"320\" width=\"304\" \/><\/a><\/div>\n<p>In order to assess energy consumption for the development detailed SAP calculations were undertaken. To derived TER and subsequent DER. As well as high levels of fabric energy efficiency the scheme is to use combine heat and power. This will not only provide very low carbon emissions, it also provides scoring benefits under NOX emissions, and low carbon technologies sections of the Code for Sustainable Homes.<\/p>\n<div style=\"clear: both; text-align: center;\"><\/div>\n<div style=\"clear: both; text-align: center;\"><a href=\"http:\/\/2.bp.blogspot.com\/-mQk170shzl8\/U7v_mOHbTeI\/AAAAAAAAAWA\/O3pHL2ebBlU\/s1600\/code_for_sustainable_homes_pre_assessment+(2).png\" style=\"margin-left: 1em; margin-right: 1em;\"><img loading=\"lazy\" decoding=\"async\" border=\"0\" src=\"http:\/\/2.bp.blogspot.com\/-mQk170shzl8\/U7v_mOHbTeI\/AAAAAAAAAWA\/O3pHL2ebBlU\/s1600\/code_for_sustainable_homes_pre_assessment+(2).png\" height=\"203\" width=\"320\" \/><\/a><\/div>\n<p>Combined heat and power will also provide considerable income for the building management company under the government Renewable Heat Incentive, a tariff which pay on renewable heat energy technologies.<\/p>\n<div style=\"clear: both; text-align: center;\"><a href=\"http:\/\/3.bp.blogspot.com\/-w6kmKpIfMyU\/U7v_neD8vWI\/AAAAAAAAAWI\/qR1mhPXjF9w\/s1600\/code_for_sustainable_homes_pre_assessment+(1).png\" style=\"margin-left: 1em; margin-right: 1em;\"><img loading=\"lazy\" decoding=\"async\" border=\"0\" src=\"http:\/\/3.bp.blogspot.com\/-w6kmKpIfMyU\/U7v_neD8vWI\/AAAAAAAAAWI\/qR1mhPXjF9w\/s1600\/code_for_sustainable_homes_pre_assessment+(1).png\" height=\"103\" width=\"320\" \/><\/a><\/div>\n<p>Further Reading:<\/p>\n<p><a href=\"http:\/\/www.lbbd.gov.uk\/Contactus\/Pages\/home.aspx\" title=\"http:\/\/www.lbbd.gov.uk\/Contactus\/Pages\/home.aspx\">Barking and Dagenham<\/a><br \/><a href=\"https:\/\/www.gov.uk\/government\/policies\/improving-the-energy-efficiency-of-buildings-and-using-planning-to-protect-the-environment\/supporting-pages\/code-for-sustainable-homes\" target=\"_blank\" rel=\"noopener\">Code for Sustainable Homes<\/a><br \/><a href=\"http:\/\/chp.decc.gov.uk\/cms\/industrial-commercial-boilers-2\" target=\"_blank\" rel=\"noopener\">NOX Levels from CHP<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Code for Sustainable Homes Pre-Assessment &#8211; Barking Acting on instructions from a firm of architects SWEL have prepared a Code for Sustainable Homes Pre-Assessment Report for a 30 unit development in Barking, London. The Project Achieved a very high SAP Rating The scheme sees the refurbishment of an existing building and a large extension to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-157","post","type-post","status-publish","format-standard","hentry","category-sustainability"],"_links":{"self":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/157","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=157"}],"version-history":[{"count":0,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/157\/revisions"}],"wp:attachment":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=157"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=157"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}