{"id":165,"date":"2014-05-01T07:52:00","date_gmt":"2014-05-01T06:52:00","guid":{"rendered":"https:\/\/southwest-environmental.co.uk\/blog\/2014\/05\/01\/flood-risk-assessment-bristol-4\/"},"modified":"2014-05-01T07:52:00","modified_gmt":"2014-05-01T06:52:00","slug":"flood-risk-assessment-bristol-4","status":"publish","type":"post","link":"https:\/\/southwest-environmental.co.uk\/blog\/2014\/05\/01\/flood-risk-assessment-bristol-4\/","title":{"rendered":"Flood Risk Assessment &#8211; Bristol"},"content":{"rendered":"<div dir=\"ltr\" style=\"text-align: left;\">Southwest Environmental Limited were commissioned to write a flood risk assessment to accompany a planning application. <\/p>\n<p>SWEl were informed that that the site was within flood zone 1, and was at low risk of flooding from tides and rivers. However, there was a question with regards to surface water flooding.<\/p>\n<div style=\"clear: both; text-align: center;\"><a href=\"http:\/\/www.wellho.net\/pix\/brisg1.jpg\" style=\"margin-left: 1em; margin-right: 1em;\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" border=\"0\" src=\"http:\/\/www.wellho.net\/pix\/brisg1.jpg\" height=\"300\" title=\"Flood_risk\" width=\"400\" \/><\/a><\/div>\n<p>Unlike most developments that see the introduction of built elements, with a subsequent decrease in attenuation, the proposal saw the introduction of large areas of woodland and meadow land which resulted in a 10% increase in attenuation. <\/p>\n<p><a href=\"http:\/\/www.southwest-environmental.co.uk\/flood%20risk%20assessment%20FRA.html\" target=\"_blank\" rel=\"noopener\">Flood Risk Bristol<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Southwest Environmental Limited were commissioned to write a flood risk assessment to accompany a planning application. SWEl were informed that that the site was within flood zone 1, and was at low risk of flooding from tides and rivers. However, there was a question with regards to surface water flooding. Unlike most developments that see [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9,13],"tags":[],"class_list":["post-165","post","type-post","status-publish","format-standard","hentry","category-flood-risk-assessment","category-surface-water-management"],"_links":{"self":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=165"}],"version-history":[{"count":0,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/165\/revisions"}],"wp:attachment":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}