{"id":170,"date":"2014-02-18T11:53:00","date_gmt":"2014-02-18T11:53:00","guid":{"rendered":"https:\/\/southwest-environmental.co.uk\/blog\/2014\/02\/18\/environmental-permit-application-exeter\/"},"modified":"2014-02-18T11:53:00","modified_gmt":"2014-02-18T11:53:00","slug":"environmental-permit-application-exeter","status":"publish","type":"post","link":"https:\/\/southwest-environmental.co.uk\/blog\/2014\/02\/18\/environmental-permit-application-exeter\/","title":{"rendered":"Environmental Permit Application &#8211; Exeter"},"content":{"rendered":"<div dir=\"ltr\" style=\"text-align: left;\">\n<h3 style=\"text-align: left;\">Environmental Permit Application &#8211; Exeter<\/h3>\n<div style=\"text-align: left;\">Acting on Instruction from a business in Exeter, Southwest Environmental were commissioned to undertake a <a href=\"http:\/\/www.southwest-environmental.co.uk\/permitting.html\" target=\"_blank\" rel=\"noopener\">environmental permit<\/a> application for a bespoke end of life vehicles, waste facility (EOLV).<\/div>\n<div style=\"text-align: left;\"><\/div>\n<h3 style=\"text-align: left;\">Environmental Permit Application -Site Condition Report<\/h3>\n<div style=\"text-align: left;\">Owing to an an industrial past it was deemed appropriate to undertake soil sampling on site to establish baseline conditions before permit issue. This is not only a requirement of the permit application but helps safe guard the operator against liabilities arising from contaminated land.<\/div>\n<div style=\"text-align: left;\"><\/div>\n<div style=\"text-align: left;\">Site works took place over two days, site surfacing although continuous was easily broken through, and sampling was completed in around 4 &#8211; 6 hours. <\/div>\n<div style=\"text-align: left;\"><\/div>\n<div style=\"text-align: left;\">Samples are currently at the labs, and records of results will be placed in the <a href=\"http:\/\/www.southwest-environmental.co.uk\/further%20info\/Site%20Condition%20Report.html\" target=\"_blank\" rel=\"noopener\">site condition report<\/a>.<\/div>\n<div style=\"text-align: left;\"><\/div>\n<h3 style=\"text-align: left;\">Environmental Permit Application &#8211; EMS<\/h3>\n<div style=\"text-align: left;\">The company do have aspirations to become accredited to ISO14001, and this would satisfy EMS requirements under the permit, but in the mean time the company will use a in house system.<\/div>\n<div style=\"text-align: left;\"><\/div>\n<div style=\"text-align: left;\">The<a href=\"http:\/\/www.southwest-environmental.co.uk\/EMS.html\" target=\"_blank\" rel=\"noopener\"> environmental management system<\/a> was written by southwest environmental with aspects and impacts being carefully considered before the products of management matrices etc.<\/div>\n<div style=\"text-align: left;\"><\/div>\n<div style=\"text-align: left;\"><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Environmental Permit Application &#8211; Exeter Acting on Instruction from a business in Exeter, Southwest Environmental were commissioned to undertake a environmental permit application for a bespoke end of life vehicles, waste facility (EOLV). Environmental Permit Application -Site Condition Report Owing to an an industrial past it was deemed appropriate to undertake soil sampling on site [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36,35],"tags":[],"class_list":["post-170","post","type-post","status-publish","format-standard","hentry","category-environmental-management","category-environmental-permit-application"],"_links":{"self":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/170","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=170"}],"version-history":[{"count":0,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/170\/revisions"}],"wp:attachment":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=170"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=170"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=170"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}