{"id":173,"date":"2014-02-06T11:11:00","date_gmt":"2014-02-06T11:11:00","guid":{"rendered":"https:\/\/southwest-environmental.co.uk\/blog\/2014\/02\/06\/geotechnical-investigation-bristol\/"},"modified":"2014-02-06T11:11:00","modified_gmt":"2014-02-06T11:11:00","slug":"geotechnical-investigation-bristol","status":"publish","type":"post","link":"https:\/\/southwest-environmental.co.uk\/blog\/2014\/02\/06\/geotechnical-investigation-bristol\/","title":{"rendered":"Geotechnical Investigation Bristol"},"content":{"rendered":"<div dir=\"ltr\" style=\"text-align: left;\">\n<div style=\"clear: both; text-align: center;\"><\/div>\n<p><b>Geotechnical Investigation Bristol<\/b><\/p>\n<p>SWEL were engaed to undertake a geotechnical investigation within an existing reatial unit, structural engineers required ground data so as to construct a mezzanine floor.<\/p>\n<p>There was restrict access on site but with the help of an expert crew from <a href=\"https:\/\/plus.google.com\/102372416272119779118\/about?hl=en\" target=\"_blank\" rel=\"noopener\">Stunt Drilling Services<\/a>,&nbsp; 3 rotary boreholes were advanced 10 meters below ground level in to the Sandstones and Coal measures that underlie the site.<\/p>\n<p>Core recovery improved with depth, and rock core logging was used to give empirical rock mass strength estimates. <\/p>\n<div style=\"clear: both; text-align: center;\"><a href=\"http:\/\/3.bp.blogspot.com\/-t2Lx699WBxE\/UvNpYA78rUI\/AAAAAAAAAMs\/ZWhiTsqwmMM\/s1600\/2.4.JPG\" style=\"margin-left: 1em; margin-right: 1em;\"><img loading=\"lazy\" decoding=\"async\" border=\"0\" src=\"http:\/\/3.bp.blogspot.com\/-t2Lx699WBxE\/UvNpYA78rUI\/AAAAAAAAAMs\/ZWhiTsqwmMM\/s1600\/2.4.JPG\" height=\"120\" width=\"640\" \/><\/a><\/div>\n<p>Below is a video of site works (drilling rig) underway.<\/p>\n<div style=\"clear: both; text-align: center;\"><object contentid=\"21ea32741ca6e9a5\" height=\"266\" width=\"320\"><\/object><\/div>\n<p>Running a drilling rig in a building can cause a build up of fumes and as such an extractor system was used to suck exhaust gas outside the building via lots of ducting.<\/p>\n<div style=\"clear: both; text-align: center;\"><a href=\"http:\/\/2.bp.blogspot.com\/-_k7LOrYNm4o\/UvNtGF1OhwI\/AAAAAAAAAM4\/J0-8a4ruyyM\/s1600\/IMG_0186.JPG\" style=\"margin-left: 1em; margin-right: 1em;\"><img loading=\"lazy\" decoding=\"async\" border=\"0\" src=\"http:\/\/2.bp.blogspot.com\/-_k7LOrYNm4o\/UvNtGF1OhwI\/AAAAAAAAAM4\/J0-8a4ruyyM\/s1600\/IMG_0186.JPG\" height=\"476\" width=\"640\" \/><\/a><\/div>\n<p><a href=\"http:\/\/www.southwest-environmental.co.uk\/Geotechnical%20SI.html\" target=\"_blank\" rel=\"noopener\">Site Investigation Bristol<\/a><\/p>\n<p><a href=\"https:\/\/plus.google.com\/113934391115595178133\/about?gl=uk&amp;hl=en\" target=\"_blank\" rel=\"noopener\">Geotechncial Consultants Bristol<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Geotechnical Investigation Bristol SWEL were engaed to undertake a geotechnical investigation within an existing reatial unit, structural engineers required ground data so as to construct a mezzanine floor. There was restrict access on site but with the help of an expert crew from Stunt Drilling Services,&nbsp; 3 rotary boreholes were advanced 10 meters below ground [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20,37],"tags":[],"class_list":["post-173","post","type-post","status-publish","format-standard","hentry","category-geotechnical","category-site-investigation"],"_links":{"self":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=173"}],"version-history":[{"count":0,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/173\/revisions"}],"wp:attachment":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}