{"id":53,"date":"2019-02-20T13:00:00","date_gmt":"2019-02-20T13:00:00","guid":{"rendered":"https:\/\/southwest-environmental.co.uk\/blog\/2019\/02\/20\/waste-to-land-feasibility-study-devon\/"},"modified":"2019-02-20T13:00:00","modified_gmt":"2019-02-20T13:00:00","slug":"waste-to-land-feasibility-study-devon","status":"publish","type":"post","link":"https:\/\/southwest-environmental.co.uk\/blog\/2019\/02\/20\/waste-to-land-feasibility-study-devon\/","title":{"rendered":"Waste to Land Feasibility Study &#8211; Devon"},"content":{"rendered":"<div dir=\"ltr\" style=\"text-align: left;\">\n<h3 style=\"text-align: left;\">Waste to Land Feasibility Study &#8211; Devon<\/h3>\n<p><a href=\"http:\/\/www.southwest-environmental.co.uk\/default.html\" target=\"_blank\" rel=\"noopener\">Southwest Environmental Limited<\/a> have recently carried out a Feasibility Study for a Company wishing to apply <a href=\"http:\/\/www.southwest-environmental.co.uk\/projects\/land_spreading_permit.html\" target=\"_blank\" rel=\"noopener\">waste to land<\/a>. The study was based around determining the amount of waste that could be applied to land for a given benefit.<\/p>\n<p>The process includes using desktop data to build a hypothetical soil condition, and a hypothetical waste composition., These values are then used with nutrient allowance from RB209 to give a allowable tonnage of waste per hectare.<\/p>\n<div style=\"clear: both; text-align: center;\"><a href=\"https:\/\/3.bp.blogspot.com\/-Ug0GDxpZbZc\/XG1Obwj1AeI\/AAAAAAAACSI\/8mdqrz08oTwFMwBbDCk7k_9AKWn1wwWXACLcBGAs\/s1600\/waste_to_land.jpg\" style=\"margin-left: 1em; margin-right: 1em;\"><img loading=\"lazy\" decoding=\"async\" border=\"0\" data-original-height=\"480\" data-original-width=\"640\" height=\"300\" src=\"https:\/\/3.bp.blogspot.com\/-Ug0GDxpZbZc\/XG1Obwj1AeI\/AAAAAAAACSI\/8mdqrz08oTwFMwBbDCk7k_9AKWn1wwWXACLcBGAs\/s400\/waste_to_land.jpg\" width=\"400\" \/><\/a><\/div>\n<p>The study is conducted in light of applying for require permissions. There are two requirements for spreading waste to land. Firstly a permit, and secondly a deployment consent.<\/p>\n<p>In order to achieve a successful application for deployment, many factor must be considered the most important of which is proving the waste is a recovery operation to the enforcer (The EA), if this cannot be done then the whole process is doomed from the outset. <\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Waste to Land Feasibility Study &#8211; Devon Southwest Environmental Limited have recently carried out a Feasibility Study for a Company wishing to apply waste to land. The study was based around determining the amount of waste that could be applied to land for a given benefit. The process includes using desktop data to build a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25,27,26],"tags":[],"class_list":["post-53","post","type-post","status-publish","format-standard","hentry","category-feasibility-study","category-land-spreading","category-waste"],"_links":{"self":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/53","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=53"}],"version-history":[{"count":0,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/posts\/53\/revisions"}],"wp:attachment":[{"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=53"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=53"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/southwest-environmental.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=53"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}